LORI GANTUNG: TRANSPORTASI HASIL TAMBANG DI PERTAMBANGAN EMAS CIKOTOK Cableway: Mining transportation in The Cikotok Gold Mine

机译:Lori Hanging:金矿Cikotok Cikotok Cikotok Cikotok Cikotok Cikotok Cikotok的运输:Cikotok金矿的采矿交通

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

AbstractThe cableway system is a common problem that is discussed in this paper. A descriptive method is used to answer the problem. The data is collected through literary studies, surveys, and interviews. The cableway is a mining transportation in the Cikotok Gold Mine. This facility was built simultaneously with the construction of the Gold Mining and ore processing plant, which was between 1936 and 1939. This lorry transported minerals from mining centers, namely Cirotan and Cikotok, to the processing plant in Pasir gombong. The results showed that the cableways were not functioned as the termination of activity in the Cikotok Gold Mine. The remaining of cableways that still there is the foundation structure of the Cirotan Station and Cikotok station buildings, and the pillars are used as SUTT PLN’s poles. The existence of the cableway for transportation of mining products is a human adaptation to the environment. Keywords: cableway, mining transportation, ore.
机译:摘要索道系统是本文讨论的常见问题。描述性方法用于回答问题。通过文学研究,调查和访谈收集数据。 Cablotok金矿是Cikotok金矿的采矿运输。该设施是在1936年至1939年间的金矿和矿石加工厂建造的同时建造。这辆卡车将矿物从采矿中心,即Cirotan和Cikotok运送到Pasir Gombong的加工厂。结果表明,缆绳没有作为Cikotok金矿的活动终止。仍然存在Cirotan站和Cikotok Station建筑物的基础结构的剩余索道,柱子用作Sutt Pln的杆子。用于运输采矿产品的索道的存在是对环境的人类适应。关键词:索道,采矿运输,矿石。

著录项

  • 作者

    Iwan Hermawan;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种 ;eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号