The factors and effect of delay in government construction project (case study in Kuantan)

机译:政府建设项目延误的因素和影响(关丹案例研究)

摘要

The problem of delays in government construction industry is a global phenomenon and there is no exception. The main purpose of this study is to identify the delay factors and the effect on the project completion. Earlier study either considered causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of effects. A questionnaire survey was conducted to identify the causes and effects delay from contractors and clients. About 40 respondents participated in the survey. This study identified the most important causes of delay from a list 45 different causes and 5 different effects of delay and the recommendation to reduce the delay. The most important causes were delays in contractor's payments to subcontractors, shortage of material in construction, delays in sub-contractors, change in material, the weather condition, shortage of manpower (skilled, semi-skilled and unskilled labour), construction works involve huge amounts of money, unpunctually material delivery, labour productivity, and unavailability of incentives for contractor for finishing ahead of schedule. Six main effects of delay were cost overrun, rescheduling and rearrangement of, litigation, disputes, and arbitration.
机译:政府建筑业的延误问题是一种全球现象,也不例外。这项研究的主要目的是确定延迟因素及其对项目完成的影响。较早的研究分别考虑了项目延误的原因或影响。本研究采用综合方法,并尝试分析影响的影响。进行了问卷调查以查明承包商和客户延误的原因。大约40位受访者参加了调查。这项研究从45种不同的延迟原因和5种不同的延迟影响中确定了延迟的最重要原因,并提出了减少延迟的建议。最重要的原因是承包商向分包商付款的延迟,建筑材料的短缺,分包商的延迟,材料的变化,天气状况,人力短缺(熟练,半熟练和非熟练劳动力),建筑工程涉及大量金额,不合时宜的材料交付,劳动生产率以及无法获得承包商提前完成的奖励措施。延迟的六个主要影响是费用超支,重新安排和重新安排,诉讼,争端和仲裁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号