Comparative study the effectiveness 4D autodesk naviswork software with traditional software planner

机译:与传统软件计划程序对比研究4D Autodesk Naviswork软件的有效性

摘要

Construction industry is the one of the key economic development activities in Malaysia. Before starting any construction, all developer, contractor, and consultant desire a project to run smoothly without any arising problem. However, there are almost same arising problem in most countries including Malaysia. Basically, these problems arise through work program implementation including the clash either between beam and column or wall and beam. These problems contribute to the delay of construction project since it takes a long time to settle the arising problems. For example, a project at United Kingdom of America was to build National Health Service Care where this project was delay because of poor planned. The poor planning of this project cause the budget run. Original budget was $4.68 billion, but when this problem happen this budget subsequently grown to $24 billion, with some observers estimating it could grow to as much as $40B. This project taking 4 years to finish up all the thing. Therefore, an alternative study had been explored to minimize the construction problems before the construction work commences. This study focused on the effectiveness planning in real construction project by using Naviswork. A few related data had been obtained from a real construction data consisting of a structural, architectural drawing, and detailed work program of the project. These drawings were developed into 3D model by using Revit software, followed with the clash detection between these models by using Naviswork. In order to check the sequence of work program, the work program had been attached into Microsoft Project, meanwhile the structural and architectural model into Naviswork. There was about 257 clashes detection between structural and architectural model. Meanwhile, a problem had been detected starting from day 373 week 54 in date 17 July 2015 through the work program simulation where the architectural model started to overtake the structural model. Once the result had been obtained, these problems need to be solved before the project commences. From this simulation, it could be concluded that there was weakness through the traditional project planning since it did not detect the problem immediately. In conclusion, all construction project should take the initiative to decrease the problem prior starting the construction work in order so that the project can run smoothly.
机译:建筑业是马来西亚的主要经济发展活动之一。在开始任何建设之前,所有开发商,承包商和顾问都希望项目能够顺利运行而不会出现任何问题。但是,在包括马来西亚在内的大多数国家中,几乎都出现了同样的问题。基本上,这些问题是通过工作程序实现而产生的,包括梁与柱或墙与梁之间的冲突。由于解决这些问题需要很长时间,因此这些问题导致了建设项目的延迟。例如,美利坚合众国的一个项目是建立国家卫生服务,但由于计划不周而延误了该项目。该项目计划不周全导致预算不足。原始预算为46.8亿美元,但是当发生此问题时,此预算随后增长到了240亿美元,一些观察家估计它可能会增长到40亿美元之多。这个项目需要4年才能完成所有事情。因此,在建筑工程开始之前,已经探索了替代研究以最大程度地减少建筑问题。这项研究的重点是使用Naviswork在实际建设项目中进行效率计划。从实际的施工数据中获得了一些相关数据,这些数据包括结构,建筑图和项目的详细工作程序。使用Revit软件将这些图形开发为3D模型,然后使用Naviswork在这些模型之间进行碰撞检测。为了检查工作程序的顺序,已将工作程序附加到Microsoft Project中,同时将结构模型和体系结构模型附加到Naviswork中。在结构模型和建筑模型之间检测到大约257次冲突。同时,从2015年7月17日的第373天第54天起,通过工作程序模拟检测到问题,其中建筑模型开始超过结构模型。一旦获得结果,就需要在项目开始之前解决这些问题。从该模拟可以得出结论,传统项目计划存在弱点,因为它没有立即发现问题。总而言之,所有建设项目应在开始施工之前主动减少问题,以使项目能够顺利进行。

著录项

  • 作者

    Nurul Amirah Khalil;

  • 作者单位
  • 年度 2017
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号