首页> 外文OA文献 >Prioritizing cost management system considerations for Nigerian housing projects
【2h】

Prioritizing cost management system considerations for Nigerian housing projects

机译:尼日利亚住房项目的优先考虑成本管理系统考虑因素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

Purpose- This study develops a success factor model to understand and facilitate improved costudmanagement system (CMS) implementation in Low-cost housing (LcH) project delivery in Nigeria.udDesign/methodology/approach- Literature findings highlight thirteen drivers’ affecting effectiveudimplementation within the CMS and employs series of brainstorming sessions and questionnaireudsurvey to validate the drivers’. Factor analysis (FA) identifies possible contextual relationshipsudamong the validated drivers’ and groups them into three success factors. The results of the FA areudrefined employing interpretive structural modelling (ISM). The ISM identifies and models theudinfluential drivers’ and aids the development of the success factor model.udFindings- Effective team qualities, information and management actions and a stable operationaludenvironment are the three essential success factors for effective CMS implementation.udPractical implications- The paper highlights effective team qualities as the most important CMSudconsiderations for Nigerian LcH project delivery. This finding creates the needed awareness toudguide project sponsors and project managers in the appropriate selection of Project ManagementudTeam (PMT) as well procurement system that facilitates their collaboration.udOriginality/value- This study is a novel research using FA and ISM to investigate the influence ofudsuccess factors needful for effective implementation within the CMS. It further develops a hierarchyudmodel that aids the PMT with the better understanding of the drivers’ and factors interrelationshipsudfor use on LcH projects within the Nigerian context.
机译:为特定目的本研究研制成功因素模型,以了解和促进改进成本 udmanagement系统在尼日利亚廉租房(LCH)项目交付(CMS)执行。 udDesign /方法/ approach-文学研究结果强调13名司机的影响有效在CMS内 udimplementation并采用头脑风暴会议和一系列问卷 udsurvey来验证驱动程序。因子分析(FA)识别可能的上下文关系 udamong验证的驱动程序,并将它们分组为三个成功因素。英足总的结果 udrefined采用解释结构模型(ISM)。在ISM识别和型号 udinfluential车手和艾滋病的成功因素模型的开发。 udFindings-有效的团队素质,信息和管理动作和稳定的运行 udenvironment是三个重要的成功因素进行有效的CMS执行。 udPractical implications-该文件强调了有效的团队素质作为最重要的CMS udconsiderations为尼日利亚LCH项目交付。这一发现创造必要的认识, udguide项目发起人和项目经理在项目管理 udTeam(PMT),以及采购系统的适当选择有利于他们的合作。 udOriginality /值 - 这项研究是利用FA和ISM一个新的研究调查的要紧的CMS内有效实施udsuccess因素的影响。它进一步发展层次 udmodel,随着更好地理解车手和因素的相互关系 udfor尼日利亚范围内对LCH项目中使用的艾滋病PMT。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号