首页> 外文OA文献 >Experience in design and construction of the Log tunnel
【2h】

Experience in design and construction of the Log tunnel

机译:日志隧道设计与构建体验

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A twin highway Log tunnel is a part of a new motorway connection between Maribor and Zagreb, section Draženci-Gruškovje, which is located towards the border crossing between Slovenia and Croatia. The tunnel is currently under construction, and only the excavation works have been completed during the writing of this paper. The terrain in the area of the Log tunnel is diverse, and the route of the highway in its vicinity is characterised by deep excavations, bridges or viaducts. The Log tunnel is approximately 250 m long, partly constructed as a gallery. The geological conditions are dominated by Miocene base rock, featuring layers of well-connected clastic rocks, which are covered by diluvium clays, silts, sands and gravels of different thicknesses. Due to the short length of the tunnel, the usual separation of the motorway route to the left and the right tunnel axes was not carried out. Thus, the tunnel was constructed with an intermediate pillar and was designed as a three-lane tunnel, including the stopping lane. The construction of the tunnel was carried out using the New Austrian tunnelling method (NATM), in which the central adit was excavated first and the intermediate pillar was constructed within it. The excavation of the main tubes followed and was divided into the top heading, bench and the invert, enabling the intermediate pillar to take the load off the top heading of both tubes. The secondary lining of the tunnel is currently under construction. The experience of the tunnel construction gathered so far is presented in the paper. The main emphasis is on the construction of the intermediate pillar, which had to take the significant and asymmetrical ground load.
机译:一条双高速公路日志隧道是马里博尔和萨格勒布(Draženci-Gruškovje)之间的新高速公路连接的一部分,位于斯洛文尼亚和克罗地亚之间的边境横穿。隧道目前正在建设中,只有在本文的写作期间只完成了挖掘工程。日志隧道区域的地形是多样的,其附近的高速公路路线的特点是深度挖掘,桥梁或高架桥。日志隧道长约250米,部分构造为图库。地质条件由中间烯基岩体主导,具有良好连接的碎屑岩层,由稀释粘土,淤泥,砂和砾石覆盖不同厚度。由于隧道的短长度,没有进行高速公路路线到左侧和右隧道轴的通常分离。因此,隧道用中间柱构造,设计为三车道隧道,包括停止车道。使用新的奥地利隧道方法(NATM)进行隧道的构造,其中首先挖掘中央配料,中间柱在其中构建。主管的挖掘遵循并分为顶部标题,工作台和倒置,使中间支柱能够将负载从两个管的顶部抬起。隧道的二次衬里目前正在建设中。迄今为止收集的隧道建筑的经验是纸张的。主要重点是建设中间柱,不得不采取显着和不对称的地层负荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号