首页> 外文OA文献 >Automatic Recognition of Common Structural Elements from Point Clouds for Automated Progress Monitoring and Dimensional Quality Control in Reinforced Concrete Construction
【2h】

Automatic Recognition of Common Structural Elements from Point Clouds for Automated Progress Monitoring and Dimensional Quality Control in Reinforced Concrete Construction

机译:自动识别钢筋混凝土施工中自动化进展监测和尺寸质量控制的点云常见结构元素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This manuscript provides a robust framework for the extraction of common structural components, such as columns, from terrestrial laser scanning point clouds acquired at regular rectangular concrete construction projects. The proposed framework utilizes geometric primitive as well as relationship-based reasoning between objects to semantically label point clouds. The framework then compares the extracted objects to the planned building information model (BIM) to automatically identify the as-built schedule and dimensional discrepancies. A novel method was also developed to remove redundant points of a newly acquired scan to detect changes between consecutive scans independent of the planned BIM. Five sets of point cloud data were acquired from the same construction site at different time intervals to assess the effectiveness of the proposed framework. In all datasets, the framework successfully extracted 132 out of 133 columns and achieved an accuracy of 98.79% for removing redundant surfaces. The framework successfully determined the progress of concrete work at each epoch in both activity and project levels through earned value analysis. It was also shown that the dimensions of 127 out of the 132 columns and all the slabs complied with those in the planned BIM.
机译:该稿件为在常规矩形混凝土建筑项目中获取的地面激光扫描点云中提取了稳健的框架,例如列,例如柱。所提出的框架利用几何原语以及对象之间的基于关系的推理到语义标记点云。然后,框架将提取的对象与计划的建筑信息模型(BIM)进行比较,以自动识别AS构建的计划和尺寸差异。还开发了一种新的方法来消除新获取的扫描的冗余点,以检测与计划BIM无关的连续扫描之间的变化。以不同的时间间隔从相同的施工站点获取五组点云数据,以评估所提出的框架的有效性。在所有数据集中,该框架成功提取了133个列中的132个,并实现了用于去除冗余表面的98.79%的精度。该框架成功确定了通过赚取的价值分析确定了在活动和项目水平中的每个时期的具体工作的进展情况。还显示出132柱中的127个尺寸和所有板坯的尺寸符合计划BIM中的那些。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号