Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

机译:核反应堆的建设成本:带量,标准化和技术进步的作用

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect Engineer (A-E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases.
机译:本文提供了法国和美国核反应堆建设成本的第一个比较分析。研究核电成本往往是一项挑战,由于缺乏可靠的数据来源和国家之间的异质性,以及需要控制投入价格和结构变化的长时间地平线。我们建立一个同时的方程式,用于控制过夜成本和施工时间(引线时间)来控制内能性,使用预期的需求变化作为仪器。我们认为,核反应堆计划标准化的福利可以通过短期协调提升,当核反应堆的施工技术的多样性低时,如果这些溢出率限制在过去的反应堆施工经验中,从学习溢出效干的长期效益类似的反应器。我们发现隔夜建筑成本直接受益于学习溢出效果,但这些溢出效应仅适用于由同一建筑师工程师(A-E)建造的核模式。此外,我们表明,在建设中,核反应堆的标准化通过减少的核心时间对建筑成本进行间接和积极影响,后者是建筑成本的主要驱动因素之一。相反,我们还探讨了搜索和发现,与其他能源技术相反,创新导致建筑成本增加。