首页> 外文OA文献 >The Influence of an Integration Time Step on Dynamic Calculation of a Vehicle-Track-Bridge under High-Speed Railway
【2h】

The Influence of an Integration Time Step on Dynamic Calculation of a Vehicle-Track-Bridge under High-Speed Railway

机译:集成时间步骤对高速铁路车辆轨道桥动态计算的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In order to study the influence of an integration time step on dynamic calculation of a vehicle-track-bridge under high-speed railway, a vehicle-track-bridge (VTB) coupled model is established. The influence of the integration time step on calculation accuracy and calculation stability under different speeds or different track regularity states is studied. The influence of the track irregularity on the integration time step is further analyzed by using the spectral characteristic of sensitive wavelength. According to the results, the disparity among the effect of the integration time step on the calculation accuracy of the VTB coupled model at different speeds is very small. Higher speed requires a smaller integration time step to keep the calculation results stable. The effect of the integration time step on the calculation stability of the maximum vertical acceleration of each component at different speeds is somewhat different, and the mechanism of the effect of the integration time step on the calculation stability of the vehicle-track-bridge coupled system is that corresponding displacement at the integration time step is different. The calculation deviation of the maximum vertical acceleration of the car body, wheel-sets and bridge under the track short wave irregularity state are greatly increased compared with that without track irregularity. The maximum vertical acceleration of wheel-sets, rails, track slabs and the bridge under the track short wave irregularity state all show a significant declining trend. The larger the vibration frequency is, the smaller the range of integration time step is for dynamic calculation.
机译:为了研究高速铁路下车辆轨道桥的积分时间步骤对车辆轨道桥的动态计算的影响,建立了车辆轨道桥(VTB)耦合模型。研究了集成时间步骤对不同速度或不同轨道规律状态下的计算精度和计算稳定性的影响。通过使用敏感波长的光谱特性进一步分析轨道不规则性对积分时间步骤的影响。根据结果​​,积分时间步骤对不同速度的VTB耦合模型的计算精度的差异非常小。更高的速度需要较小的集成时间步骤来保持计算结果稳定。积分时间步骤对不同速度的每个组分的最大垂直加速度的计算稳定性的效果略微不同,积分时间步骤对车辆轨道桥耦合系统的计算稳定性的影响的机制是积分时间步骤的相应位移是不同的。与没有跟踪不规则性的情况相比,轨道短波不规则状态下的汽车主体,车轮组和桥梁的最大垂直加速度的计算偏差大大增加。车轮套,轨道,轨道板和桥梁的最大垂直加速度在轨道短波不规则状态下都显示出显着下降的趋势。振动频率越大,积分时间步长的范围越小是用于动态计算的。

著录项

  • 作者

    Junjie Ye; Hao Sun;

  • 作者单位
  • 年度 2021
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号