THE OSIRIS-REX Asteroid Sample Return -MISSION Operations Design

机译:Osiris-rex小行星样本返回-mission操作设计

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the missions science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the SRC lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis.Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together space craft, instrument and operations scenarios. The project implemented lessons learned from other small body missions: APLNEAR, JPLDAWN and ESARosetta. The key lesson learned was expected the unexpected and implement planning tools early in the lifecycle. In preparation to PDR, the project changed the asteroid arrival date, to arrive one year earlier and provided additional time margin. STK is used for Mission Design and STKScheduler for instrument coverage analysis.
机译:Osiris-Rex Mission采用了一种有条不紊的分阶段方法,以确保成功满足任务科学要求。 Osiris-rex于2016年9月推出,备份发布期间一年后发生。抽样发生在2019年。从Bennu的出发燃烧于2021年3月发生.2023年9月24日,SRC在犹他州测试和培训范围内(UTTR)。明星遗产手术后遵循将SRC运送到Johnson Space Center,其中样品被拆除并交付给Osiris-rex策策设施。经过六个月的初步考试期后,任务将产生返回的样本目录,允许全球社区申请样本进行详细分析。在需要在需要独特的操作之前从未探索的小行星返回样本。设计参考任务(DRM)将空间工艺,仪器和操作场景连接在一起。该项目实施了从其他小型任务中吸取的经验教训:Aplnear,JPLDawn和eSarosetta。所学到的主要课程预计将在生命周期早期意外实施规划工具。在准备促使PDR时,该项目改变了小行星到达日期,一年越早到达,并提供额外的时间保证金。 STK用于仪器覆盖分析的任务设计和Stkscheduler。

著录项

  • 作者

    Jonathan Gal-Edd;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号