首页> 外文OA文献 >An integrated pit-to-plant approach using technological models for strategic mine planning of copper and gold deposits
【2h】

An integrated pit-to-plant approach using technological models for strategic mine planning of copper and gold deposits

机译:一种综合坑对植物方法,采用铜和金矿床战略矿山规划技术模型

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Abstract The strategic mine plan is a crucial step for the success of mining companies, and for its development, it is necessary to use a number of inter-related variables that are usually estimated independently. These variables include operational data that is traditionally isolated in information islands between the different departments in the mine or they are consolidated into individual models. This reduces the holistic view of the deposit, thereby causing a negative impact on the results of the strategic planning itself. In order to improve the process and to maximize the production and/or value of a mining project, there needs to be an integration of the geology, the mine plan, the processing and the geometallurgy data. In order to accomplish this, a new methodology is proposed for the creation of a technological model. This model can be interpreted as the consolidation of the different models required for a better understanding of the geological and technical information of the deposit. This concept was developed and applied at a copper and gold mine site located in Brazil. Based on the evaluation of different blasting and mill productivity scenarios through a pit-to-plant approach, it was possible to obtain operational short-term gains such as a 10.7% increase in the plant production rate and a 2.2% increase in the crusher's feed rate with little or no capital investment.
机译:摘要战略矿山计划是矿业公司成功的关键步骤,以及其开发,有必要使用通常独立估计的许多与相关的变量。这些变量包括传统上在矿区的不同部门之间的信息群岛中孤立的运营数据,或者它们被整合到单个模型中。这减少了沉积物的整体视图,从而导致对战略规划本身的结果产生负面影响。为了改善过程并最大限度地提高矿业项目的生产和/或价值,需要融入地质,矿山计划,处理和地质冶金数据。为了实现这一点,提出了一种新方法来创建技术模型。该模型可以解释为巩固所需的不同模型,以更好地了解押金的地质和技术信息。这一概念是在位于巴西的铜和金矿网站上开发和应用。基于通过坑植物方法对不同爆破和轧机生产率情景的评估,可以获得运营短期收益,例如植物生产率增加10.7%,破碎机饲料增加2.2%速度很少或没有资本投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号