首页> 外文OA文献 >Feasibility Studies on Projects in Musi-Banyuasin River Basins Part 1: General Studies on Sediment
【2h】

Feasibility Studies on Projects in Musi-Banyuasin River Basins Part 1: General Studies on Sediment

机译:穆斯瓦苏斯河流域项目的可行性研究第1部分:沉积物一般研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This is an extract of a feasibility-study report on the two projects, 'Consolidation of Infrastructure of Biofuel Industry,in Musi- Banyuasin regency and ditto in Banyuasin regency. PART 1 is of general studies on sediment in the Musi-Banyuasin River system where the project sites are located. The primary objective of this report is to forward solution to the sediment-origin problems, which is a compulsory subject for any projects in the Musf-Banyuasin River system. To attain this objective, it clears the following secondary objectives, viz. (a) identifying every problem hindering human lives and activities, (b) drawing a hypothesis about causality, (e) determining basic data by field surveys, lab tests and data analyses and (d) authenticating the hypothesis to be a theory. To achieve these objectives, the studies have gone forward with four represenfative objects, viz. (i) the Muba River system as a wholee, (ii) the lower reaches of the main stream, (iii) the biggest tributary ,and (iv) the biggest dis-tributary. It concludes that sediment is the sole cause of major problems, forwards measures to solve the problems, and suggests do's and don’ts. PART 2, 'Particular Studies on a Certain Project,' explains how the results of PART 1 are applied to the project. PART 1 leaves the verification of the suggested technical systems to full-scale/ in­-situ model tests that are elaborated in PART 2 and to baexecuted in the first step of each project.
机译:这是关于两项项目的可行性研究报告的提取物,“生物燃料工业基础设施基础设施,在鲍悦菊属植物植物植物植物摄政堂的巩固。第1部分是关于项目网站所在的穆斯瓦苏斯河系统中沉积物的一般性研究。本报告的主要目标是转发对沉积物原点问题的解决方案,这是番荔枝植物河流系统中任何项目的强制性主题。为了实现这一目标,它可以清除以下次要目标,viz。 (a)识别妨碍人类生命和活动的每个问题,(b)借鉴关于因果关系的假设,(e)通过现场调查确定基本数据,实验室测试和数据分析和(d)验证假设是一个理论。为了实现这些目标,研究已经前进了四个代表性对象,viz。 (i)Muba River System作为妓女,(ii)主要流的下游(iii)最大的支流和(iv)最大的分支机构。它的结论是,沉积物是主要问题的唯一原因,转发解决问题的措施,并建议做和不做。第2部分,'对某个项目的特殊研究,解释了第1部分的结果应用于该项目。第1部分留下所建议的技术系统验证,以满足/原位模型测试,这些测试在第2部分中阐述,并在每个项目的第一步中Baexecuemed。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号