首页> 外文OA文献 >Full-Scale 3D Vibration Simulator for an Entire Nuclear Power Plant on the Simple Orchestration Application Framework
【2h】

Full-Scale 3D Vibration Simulator for an Entire Nuclear Power Plant on the Simple Orchestration Application Framework

机译:整个核电站整个核电站的全尺寸3D振动模拟器在简单的编音应用程序框架上

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

So far, we have developed Full-scale 3D Vibration Simulator for an Entire Nuclear Power Plant which is simulationplatform to analyze seismic response of a whole digitalized nuclear power plant. In this work, we introducedpipelined data-transfer scenario in which boundary condition data between plant's components are transferred eachtime step from large components to small components while all components simulations are run in parallel. We developedgrid-enabled application to perform this simulation more efficiently using various computing resources. Inthe development, we confronted two problems; first, pre-existing grid technology still does not sufficiently support torealize pipelined data-transfer and second, to realize long time simulation by the scenario, functionality enabling simulationrestarting to be automated is necessary. As solution of these problems, we used Simple OrchestrationApplication Framework (SOAF) which enabled pipelined data-transfer to be realized in easy and simple way and simulationrestarting to be automated. Using the SOAF, we developed grid-enabled application and succeeded seismicanalysis simulation of a test reactor in pipelined data-transfer scenario for about a week. In this paper, the details ofall of this work will be presented.
机译:到目前为止,我们已经为整个核电站开发了全尺寸的3D振动模拟器,该核电厂是仿真平台,用于分析整个数字化核电站的地震响应。在这项工作中,我们推出了流水线数据传输场景,其中工厂组件之间的边界条件数据每次从大量组件转移到小组件,而所有组件模拟都并联运行。我们开发了支持电网的应用程序以更有效地使用各种计算资源来执行此模拟。在发展中,我们遇到了两个问题;首先,预先存在的网格技术仍然不充分支持实现流水线数据传输和第二,以实现通过方案的长时间仿真,使得能够重新启动以自动进行自动化。作为这些问题的解决方案,我们使用了简单的编排应用程序框架(SOAF),该框架(SOAF)使能流水线数据传输能够以简单而简单的方式实现,并进行仿真重启以自动化。使用SOAF,我们开发了支持电网的应用程序和在流水线数据传输方案中的测试反应器的成功地震分析模拟大约一周。在本文中,将提出所有这项工作的细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号