首页> 外文OA文献 >Factoring in scheduled repairs of generating units when assessing the resource adequacy of electric power systems
【2h】

Factoring in scheduled repairs of generating units when assessing the resource adequacy of electric power systems

机译:在评估电力系统资源充足性时,在进行机组的预定修复

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This study presents the algorithms for modeling of scheduled repairs of generating equipment when assessing the resource adequacy of electric power systems by the Monte Carlo method that relies on random events. We present an analysis of the algorithms adopted in the available software and computer systems used to assess the resource adequacy and highlight their shortcomings. We propose an algorithm for modeling of scheduled repairs of generating units that does away with the flaws of the algorithms adopted elsewhere. In the final part of the article, we present the findings of numerical experiments that test the performance of the algorithms.
机译:该研究提出了用于通过依赖于随机事件的蒙特卡罗方法评估电力系统的资源充分性时,用于建模发电设备的调度修复算法。我们对用于评估资源充足性的可用软件和计算机系统采用的算法进行了分析,并突出了其缺点。我们提出了一种算法,用于建模调度修复的生成单元,这些单元与其他地方采用的算法的缺陷一起消失。在本文的最后部分,我们介绍了测试算法性能的数值实验的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号