首页> 外文OA文献 >Risk Assessment of High-Speed Rail Projects: A Risk Coupling Model Based on System Dynamics
【2h】

Risk Assessment of High-Speed Rail Projects: A Risk Coupling Model Based on System Dynamics

机译:高速铁路项目风险评估:基于系统动态的风险耦合模型

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Due to their characteristics and multiple objectives, high-speed rail (HSR) projects carry more complex risks than conventional projects and high correlation and conductivity are among the associated risk factors. Previous risk assessment frameworks for rail infrastructure have ignored the effects of risk interactions that inflate risk levels, namely, risk coupling effects. Based on a system dynamics method, this paper develops a risk coupling model for HSR project risk assessments. A risk factor list is established from a literature review, and relationships analysed using a case study and expert interviews. System dynamics equations are constructed and their parameters obtained by expert evaluations of risk factors. The proposed model is applied to a real-world HSR project to demonstrate it in detail. The model can evaluate the risk levels of HSR projects during a simulation period. In particular, it can identify the key coupling effects that are the main increased risk. It provides a significant resource, using which HSR project managers can identify and mitigate risks.
机译:由于它们的特点和多种目标,高速铁路(HSR)项目携带比传统项目更复杂的风险,并且高相关和电导率是相关的危险因素。以前的轨道基础设施风险评估框架忽略了风险相互作用的影响,使风险水平造成风险水平,即风险耦合效应。基于系统动力学方法,本文开发了HSR项目风险评估的风险耦合模型。危险因素列表是从文献审查中建立的,并且使用案例研究和专家访谈分析的关系。构建系统动力学方程及其通过危险因素的专家评估获得的参数。所提出的模型应用于真实世界的HSR项目,详细展示。该模型可以在仿真期间评估HSR项目的风险等级。特别是,它可以识别主要增加风险的关键耦合效果。它提供了一个重要的资源,使用哪些HSR项目经理可以识别和减轻风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号