首页> 外文OA文献 >Siting evaluations for the ignitor fusion experiment: Preliminary radiological assessments
【2h】

Siting evaluations for the ignitor fusion experiment: Preliminary radiological assessments

机译:点火器融合实验的选址评估:初步放射性评估

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Ignitor is a proposed compact high-magnetic field tokamak aimed at studying plasma burning conditions in Deuterium-Tritium plasmas. Localisation of this experiment in Italy has seen growing attention during the last years. The determination to carry out this project in Italy has driven to taking into account several candidate sites. Recently, due to several technical reasons, it was identified a new site, the Caorso Site, in northern Italy, a nuclear site were a nuclear power reactor was sited. Preliminary Radiological Impact analyses for the siting of Ignitor in Caorso are presented in this paper. Te Ignitor radiological impact turns out to be negligible both during normal operation and in case of accident.
机译:点火器是一个建议的紧凑型高磁场托卡卡克,旨在研究氘氚蒸质素的血浆燃烧条件。本实验在意大利的本地化在过去几年中受到影响。在意大利执行该项目的决心已触及几个候选地点。最近,由于几种技术原因,它被确定了一个新的网站,核现场,核电站是核电站的核电站。本文介绍了Caorso中点火器选址的初步放射性冲击分析。在正常运行期间和事故发生时,Te Iquitor放射辐射的影响结果可以忽略不计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号