The Key Construction Technology Research on the Intercontinental Shanghai Wonderland

机译:上海洋红色乡村关键施工技术研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Intercontinental Shanghai Wonderland is the first natural ecological hotel built in an abandoned mine in the world, which faces many difficulties in the construction process. To solve the difficult problems in the construction process, the study was carried out from the stability analysis of the deep pit cliff, the mechanical performance of the structure, and the construction technology. The Intercontinental Shanghai Wonderland is built around the abandoned deep pit cliffs, and the stability of the deep pit cliffs directly affects the safety of the building. The dynamic response characteristics and the instability characteristics of the mine slope under the dynamic response were analyzed by a three-dimensional dynamic finite element method. The calculation results showed that with effective anchoring support measures, the stability coefficient of slope under static load and small earthquakes was large, which had a certain safety margin. Under the action of large earthquakes, the slope could still meet the stability requirements. The structure of the Intercontinental Shanghai Wonderland is a unique two-point support structure system. It shows the deformation and stress characteristics of one fixed end and one simply supported end under horizontal load. The elastic-plastic time history response of structures under actions of rare earthquakes was analyzed through the finite element analysis software. The analysis results show that the current structural system along with the design of component size and strength can meet the seismic performance of the structure under actions of rare earthquakes. The Intercontinental Shanghai Wonderland was built in a stone pit 88 m below the surface. Therefore, the transportation of materials was a difficulty in the construction process. A set of ultradeep concrete downward conveying equipment was invented to solve the difficulty. The construction process of the whole structure was simulated by finite element software, which provided a safety guarantee for the construction of the whole structure.
机译:上海洲际奇迹是第一个在世界被遗弃的矿井中建造的自然生态酒店,这面临施工过程中的许多困难。为了解决施工过程中的困难问题,从深坑悬崖的稳定性分析,结构的机械性能和施工技术进行了研究。上海洲际奇迹围绕着被遗弃的深坑悬崖建造,深坑悬崖的稳定性直接影响了建筑物的安全性。通过三维动态有限元法分析了动态响应下矿山斜率的动态响应特性和不稳定特性。计算结果表明,利用有效的锚固支撑措施,静态负荷下坡度和小地震下的稳定性系数大,具有一定的安全保证金。在大地震的作用下,斜坡仍然可以满足稳定要求。上海洲际奇迹的结构是一个独特的两点支持结构系统。它显示了一个固定端的变形和应力特性和水平负载下的一个简单地支撑的端部。通过有限元分析软件分析了稀土地震作用下结构的弹性塑料时间历史响应。分析结果表明,目前的结构系统随着元件尺寸和强度的设计,可以满足稀土地震作用下结构的地震性能。上海洲际奇妙仙境建于地面下方88米。因此,材料的运输是施工过程的困难。发明了一套UltraDeep混凝土向下传送设备以解决困难。通过有限元软件模拟整个结构的施工过程,为整个结构的构建提供了安全保证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号