首页> 外文OA文献 >Single Machine Slack Due-Window Assignment and Scheduling of Linear Time-Dependent Deteriorating Jobs and a Deteriorating Maintenance Activity
【2h】

Single Machine Slack Due-Window Assignment and Scheduling of Linear Time-Dependent Deteriorating Jobs and a Deteriorating Maintenance Activity

机译:单机松弛到期窗口分配和线性时间依赖性劣化作业的调度和维护活​​动恶化

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In this paper, we consider the slack due-window assignment model and study asingle machine scheduling problem of linear time-dependent deteriorating jobsand a deteriorating maintenance activity. The cost for each job consists offour components: earliness, tardiness, window location and window size. Theobjective is to schedule the jobs and to assign the maintenance activity anddue-windows such that the total cost among all the jobs is minimized. Apolynomial-time algorithm with the running time not exceeding $O(n^2logn)$ togive a solution to this problem is introduced, where $n$ is the number of jobs.
机译:在本文中,我们考虑了松弛的到期窗口分配模型,并研究了线性的时间依赖性恶化作业和维护活动恶化的单机调度问题。每个工作的成本包括四个部分:提前,拖后,窗口位置和窗口大小。目的是安排作业并分配维护活动和到期窗口,以使所有作业之间的总成本最小化。引入了运行时间不超过$ O(n ^ 2logn)$的多项式时间算法来解决该问题,其中$ n $是作业数。

著录项

  • 作者

    Bo Cheng; Ling Cheng;

  • 作者单位
  • 年度 2018
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"english","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号