首页> 外文OA文献 >Dynamic Management of Water Storage for Flood Control in a Wetland System: A Case Study in Texas
【2h】

Dynamic Management of Water Storage for Flood Control in a Wetland System: A Case Study in Texas

机译:湿地系统防洪蓄水器动态管理 - 以德克萨斯州为例

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In this study, we assess the costs and benefits of dynamic management of water storage to improve flood control in a system of wetlands. This management involves releasing water from wetlands ahead of (e.g., a few hours or days before) a rainfall event that is forecasted to produce flooding. Each project site may present different challenges and topographical conditions, however as long as there is a relatively small hydraulic gradient between the wetland water surface and the drainage ditch (e.g., >0.9 m), wetlands can be engineered for the purpose of flood control. We present a case study for a system comprised of four wetland areas encompassing 925 acres in the coastal plain south of Houston, Texas. The benefit–cost analysis shows that, in general, the benefits of wetland ecosystems far surpass the costs of construction and maintenance for all considered periods of analysis and assumed degrees of dynamic management of wetland storage. The analysis also shows that the benefit/cost ratios increase over the period of analysis. Considering flood protection only (e.g., not considering the value of other ecosystem services), as long as dynamic management of wetland storage increases flood protection by about 50% compared to that with no management (e.g., a typical wetland with no controlled release of water), the construction of a wetland system would have a benefit/cost ratio of at least 1.9.
机译:在这项研究中,我们评估了蓄水池动态管理的成本和益处,以改善湿地系统中的防洪。该管理涉及从预测产生洪水的降雨事件之前(例如,几小时或几天)从湿地释放水。每个项目网站都可能出现不同的挑战和地形条件,只要湿地水表面和排水沟之间存在相对较小的液压梯度(例如,> 0.9米),湿地就可以为防洪控制而设计。我们为德克萨斯州休斯顿南部的沿海平原占地925英亩,提供了一个由四个湿地地区组成的系统的案例研究。益处成本分析表明,一般而言,湿地生态系统的好处远远超过了所有考虑的分析期间和假设湿地储存的动态管理程度的建筑和维护成本。分析还表明,在分析期内的益处/成本比率增加。仅考虑洪水保护(例如,不考虑其他生态系统服务的价值),只要湿地存储的动态管理增加了大约50%的洪水保护,而没有管理层(例如,典型的湿地没有受控释放水),湿地系统的建设将具有至少1.9的益处/成本比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号