首页> 外文OA文献 >Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method
【2h】

Selection of Multimode Resource-Constrained Project Scheduling Scheme Based on DEA Method

机译:基于DEA方法的多模资源受限项目调度方案的选择

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A multimode resource-constrained project scheduling problem (MRCPSP) may have multifeasible solutions, due to its nature of targeting multiobjectives. Given the NP-hard MRCPSP and intricate multiobjective algorithms, finding the optimized result among those solutions seems impossible. This paper adopts data envelopment analysis (DEA) to evaluate a series of solutions of an MRCPSP and to find an appropriate choice in an objective way. Our approach is applied to a typical MRCPSP in practice, and the results validate that DEA is an effective and objective method for MRCPSP solution selection.
机译:由于其靶向多目标的性质,多模资源受限的项目调度问题(MRCPSP)可能具有多种解决方案。鉴于NP-Hard MRCPSP和复杂的多目标算法,在这些解决方案中找到优化的结果似乎是不可能的。本文采用数据包络分析(DEA)来评估MRCPSP的一系列解决方案,并以客观方式找到适当的选择。我们的方法在实践中应用于典型的MRCPSP,结果验证了DEA是MRCPSP解决方案选择的有效和客观方法。

著录项

  • 作者

    Song Zhang;

  • 作者单位
  • 年度 2020
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号