Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For the acceptable solution relevant to task points in construction equipment scheduling, transfer table is divided into four regions. After proper augmentation and deflation, the acceptable solution evolves into global coordinating solution of construction scheduling, which contributes to minimizing slowdown and deadhead mileages. This method has been verified in practical engineering and is a significant reference on decision making of construction equipment scheduling.
机译:当大型设备慢慢移动时,大量的能量消失了。通常,施工现场的设备调度应该最大限度地减少设备放缓和戴头部移动。始终采用表方法来优化转移序列,但可行的解决方案很令人失望。对于与施工设备调度中的任务点相关的可接受的解决方案,转移表分为四个区域。在适当的增强和通货紧缩后,可接受的解决方案发展成为施工调度的全局协调解决方案,这有助于最小化减速和死头部内部。该方法已在实际工程中验证,是建筑设备调度决策的重要参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号