首页> 外文OA文献 >PENERAPAN ENGINEERING CONTROL DAN ADMINISTRATIVE CONTROL SEBAGAI BENTUK INTERVENSI ERGONOMI DI PT GANDING TOOLSINDO
【2h】

PENERAPAN ENGINEERING CONTROL DAN ADMINISTRATIVE CONTROL SEBAGAI BENTUK INTERVENSI ERGONOMI DI PT GANDING TOOLSINDO

机译:工程控制与行政控制在PT Ganding Toolsindo中的符合人体工程学干预形式的应用

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

PT. Ganding Toolsindo,sebuah perusahaan  manufaktur yang bergerak di bidang industri otomotif, mengalami permasalahan ergonomi berdasarkan tanda-tanda umum terjadinya permasalahan ergonomi yaitu apparent trend in accidents and injuries, incidence of CTD (cumulative trauma disorder), absenteeism & high turnover rates, employee complaints, poor quality,dan  manual material handling. Permasalahan  yang menjadi focus untuk diselesaikan oleh perusahaan adalah CTD. Penelitian  pada dua stasiun kerja utama  yang bermasalah  yaitu mesin chinfong dan ada yang menggunakan tiga tools yaitu Rapid Upper Limb Assessment (RULA), Nordic Body Map dan pengukuran momen tubuh dengan software Mannequin Pro 7. Hasil dari ketiga tools ini menunjukkan perlu dilakukan intervensi ergonomi dengan pendekatan engineering control maupun administrative control. Intervensi dengan pendekatan engineering control dilakukan dengan meninggikan area kerja dan modifikasi bangku kerja, sedangkan pendekatan administrative control dilakukan dengan menerapkan rotasi kerja dan pemanasan tubuh sebelum bekerja. Hasil implementasi intervensi ergonomic menunjukkan adalanya penurunan pada skor RULA, persentasi keluhan tubuh dan penggunaan momen tubuh. Kata Kunci: CTD, intervensi ergonomi, engineering control, administrative control     PT. Ganding Toolsindo, a manufacturing company engaged in the automotive industry, ergonomics problems experienced by general signs of ergonomics problems are apparent trend in accidents and injuries, incidence of CTD (cumulative trauma disorder), high absenteeism & turnover rates, employee complaints, poor quality, and manual material handling. The problems to be resolved by the company's focus for the CTD. Research on the two main work stations that are problematic and aida chinfong machine uses three tools namely Rapid Upper Limb Assessment (Rula), Nordic Body Map and measurement of body moments with Mannequin Pro 7 software. The results of all three tools show ergonomics intervention needs to be done with engineering controls and administrative approach control. Intervention by engineering control approach conducted by elevating the work area and modification work benches, while the administrative approach to control is done by implementing job rotation and heating of the body before work. The results of the implementation of ergonomic interventions showed a decrease in scores adalanya Rula, percentage of body complaints and use of body moments. Keyword: CTD, ergonomic intervention, engineering controls, administrative controls
机译:Pt。的岗顶Toolsindo,一家制造公司从事汽车行业的基础上,符合人体工程学的问题,事故和伤害,CTD的发病率分别趋势明显(累积性创伤失调),缺勤率和高周转率,员工投诉一般体征遇到一个符合人体工程学的问题,质量差,和人工搬运材料。由公司成为一家专注于完整的问题是CTD。研究有问题金丰机器和一些使用三种工具,即快速上肢评估(RULA),北欧身体图和测量身体的时刻与模特Pro 7的软件的两个主要的工作站,这三个工具的结果表明,需要符合人体工程学的干预工程控制方法和管理控制。与工程控制方法干预是通过增大工作区域和工作的改进进行的,而行政调控的方法是通过应用工作的旋转和工作之前加热体进行。符合人体工程学的干预的实施结果显示,在RULA评分的减少,身体投诉的比例和使用身体的时刻。关键词:CTD,人机工程学干预,工程控制,管理控制PT。的岗顶Toolsindo,一家制造公司从事汽车行业,人体工程学问题通过人机工程学问题的通用标志出现的所有事故和伤害,CTD发病趋势明显(累积性创伤失调),高缺勤率和离职率,员工的投诉,低质量,和人工搬运材料。该问题由公司的工作重点为CTD解决。研究的两个主要工作站是有问题的,阿依金丰机器使用三个工具即快速上肢评估(RULA),北欧身体图和体矩的测量随着模特Pro 7的软件。所有三个工具的结果显示人体工程学干预需要做随着工程控制和管理方法控制。通过升降的工作区和修正工作台传导,而管理方式,能控制通过实施岗位轮换和暖气正文之前完成工作工程控制方法干预。符合人体工程学的干预实施的结果显示在比分Adalanya RULA,身体投诉和运用身体矩的百分比下降。关键字:CTD,符合人体工程学的介入,工程控制,管理控制

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号