首页> 外文OA文献 >PERENCANAAN DAN PENJADWALAN DISTRIBUSI DENGAN udMETODE DISTRIBUTION REQUIREMENT PLANNING udDI CV. FAJAR TEKNIK SEJAHTERA, SIDOARJO ud
【2h】

PERENCANAAN DAN PENJADWALAN DISTRIBUSI DENGAN udMETODE DISTRIBUTION REQUIREMENT PLANNING udDI CV. FAJAR TEKNIK SEJAHTERA, SIDOARJO ud

机译:配送计划和调度分配要求计划方法简历。 FaJaR TEKNIK sEJaHTERa,sIDOaRJO

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

udA lot of companies are faced with the problems associatedudthe distribution system. The problem arises because consumers are atudgeographically separate locations, this has resulted in the need toudstore inventory at multiple locations so as to causeudproblems in coordinating the management of the distribution systemudmarketing, as well as on the production that will produce the best products.udIt required a good distribution system and supply productsudappropriate to the level of customer satisfaction and corporate profits canudawake.udCV. Dawn Prosperous Engineering is a manufacturing company engagedudin the field of industrial coatings Roll Conveyor and Rubber Packing, distributionudthe company is based at the request of the customer. InsideudThis company has not found the existence of a planning and schedulingudproduct distribution activities are well coordinated, so the demandudfor each type of product resulting in less controlleduddelays in product distribution.udGiven these problems, it carried out the planning anduddistribution scheduling methods Distribution Requirements Planning (DRP).udIt is expected that the planning and scheduling of distribution activitiesudwell, success in meeting customer demand will become moreudoptimal, improved sales performance in fulfilling orders in a timely mannerudand the right amount so that distribution costs can be minimized.udThe results of the research showed that scheduling activities for the distributionudRoll Conveyor products in March 2012 as the delivery to Pasuruanud140 units, Malang as many as 119 units, as many as 131 units Mojokerto, Jombangudas many as 136 units and as many as 142 units Kediri. For products Rubber PackingudIn March 2012 the delivery to as many as 218 units Pasuruan, Malangudas many as 246 units, as many as 235 units Mojokerto, Jombang many as 241 units,udand Kediri many as 254 units. Cost distribution by the method of the company inud2011 amounting to Rp. 49,798,900, - while the cost of distribution by the method ofudDistribution Requirements Planning (DRP) in 2011 amounted to Rp. 45,519,050, -.udThen obtained savings of Rp. 4,279,850, - or 8.59% per year.
机译:ud许多公司都面临着与分销系统相关的问题。出现问题的原因是,消费者位于预算上分开的位置,这导致需要在多个位置存储库存,从而导致 udproblem协调分销系统的管理 udmarketing,以及将要生产的产品。生产出最好的产品。 ud它需要一个良好的分销系统并提供产品 udap适合客户满意度和企业利润的水平 udCV。 Dawn Prosperous Engineering是一家从事 uD在工业涂料辊式输送机和橡胶包装领域中的制造公司,该公司可以根据客户的要求进行分销。内部 ud该公司尚未发现计划和日程安排 ud产品分发活动的存在得到很好的协调,因此每种产品类型的需求 ud导致产品分发中的受控 uddelay较少。 ud鉴于这些问题,它进行了计划和 ud分配计划方法分配需求计划(DRP)。 ud期望分配活动的计划和计划满足客户需求的成功率将变得不理想,及时履行订单会提高销售业绩 ud研究结果表明,2012年3月配送 udRoll输送机产品的调度活动为向Pasuruan交付 ud140台,玛琅多达119台, Mojokerto多达131个单位,Jombang udas多达136个单位和Kediri多达142个单位。用于橡胶包装的产品2012年3月,Pasuruan交付了218台,Malang udas交付了246台,Mojokerto交付了235台,Jombang交付了241台,Kediri交付了254台。通过公司的方法在 ud2011中进行的成本分摊为Rp。 49,798,900,-而采用 udDistribution Requirements Planning(DRP)方法分配的成本在2011年为Rp。 45,519,050,-。 ud然后节省了Rp。 4,279,850,或每年8.59%。

著录项

  • 作者

    ADIK ALFAN ARIANDI;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"id","name":"Indonesian","id":20}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号