首页> 外文OA文献 >PERENCANAAN DISTRIBUSI PRODUK PAVING DENGAN MENGGUNAKAN METODE DISTRIBUTION REQUIREMENT PLANNING (DRP) (Studi Kasus Di UD. DUA SAUDARA - Surabaya
【2h】

PERENCANAAN DISTRIBUSI PRODUK PAVING DENGAN MENGGUNAKAN METODE DISTRIBUTION REQUIREMENT PLANNING (DRP) (Studi Kasus Di UD. DUA SAUDARA - Surabaya

机译:使用分销需求计划(DRp)方法进行产品分销计划(UD.DUa saUDaRa - 泗水的案例研究)

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Many companies are often faced with the problems associated with distribution system. This problem arises because consumers are in geographically dispersed locations, this resulted in the need to keep inventories in multiple locations so that it can cause problems on management in coordinating the distribution system from the marketing department, also in the production that will produce the best product. It required a good distribution system and supply the right products for customer satisfaction and corporate profits can be maintained. UD DUA SAUDARA is a medium scale company that is developing, engaged in the production of paving and capable of supplying the product in Surabaya and its surrounding areas such as earth Sari Stores, Putra Makmur, Sinar Jaya, and Nusa beautiful, even now start reaching markets outside the island. The company has various kinds of products, but in this study we take two types of products namely Paving gray box (PKA), and Paving the red box (PKM). UD DUA SAUDARA�s distribution system which is currently run by a company has several weaknesses. Among them are frequent delays in product delivery for an order Given these problems, then conducted research with the method of Distribution Requirements Planning (DRP) in the hope to be distributing the product from the company to optimally store. Distribution Requirements Planning is a method to handle the procurement of supplies in an echelon distribution network. The purpose of the Distribution Requirements Planning (DRP), which make planning and scheduling activities of a good distribution, so that success in meeting customer demand will be more optimal, increase sales performance in fulfilling orders in a timely and appropriate amount so that distribution costs can be reduced seminimun possible. Results for comparison of distribution costs by using the method the company is Rp. 12.496.500,00 and for the DRP method is Rp. 9.156.200,00, with a savings of 26,71. The results obtained planning and scheduling Sari earth distribution is as follows, PKA Products: Shipping found in March, June, September and December 297 m2, PKM Products: Shipping found in March, June, September, November and February as much as 256 m2. Putra Makmur, PKA Products: Shipping found in April, July, October and January as much as 294 m2, PKM Products: Shipping found in March, June, September and December as many as 259 m2. Sinar Jaya, PKA Products: Shipping found in April, July, October and January, 296 m2, PKM Products: Shipping found in March, June, September and December 262 m2. Nusa Indah, PKA Products: Shipping found in April, July, October and January as much as 289 m2, PKM Products: Shipping found in March, June, September and December 255 m2.
机译:许多公司经常面临与分销系统相关的问题。出现此问题的原因是,消费者位于地理位置分散的位置,因此需要将库存保持在多个位置,以便在协调营销部门的分销系统以及生产最佳产品的生产中可能引起管理方面的问题。它需要一个良好的分销系统,并提供合适的产品以使客户满意,并可以保持公司利润。 UD DUA SAUDARA是一家中等规模的公司,正在开发,从事铺路的生产,并能够在泗水及其周边地区(如地球纱丽店,Putra Makmur,Sinar Jaya和Nusa beautiful等地区)提供产品,甚至现在就开始销售岛外的市场。该公司提供各种产品,但在本研究中,我们采用两种类型的产品,即铺路灰箱(PKA)和铺路红箱(PKM)。目前由公司运营的UD DUA SAUDARA的分销系统存在一些弱点。考虑到这些问题,其中经常会出现订单交付延迟的情况,因此,他们使用“分销需求计划”(DRP)的方法进行了研究,希望能够将产品从公司分销到最佳的商店。分发需求计划是一种在梯队分发网络中处理物资采购的方法。分发需求计划(DRP)的目的是使计划和安排活动的分布良好,从而使成功满足客户需求的最佳化,及时和适当数量的订单履行中提高销售业绩,从而降低分发成本可以减少半数免疫。通过使用公司为Rp的方法比较分销成本的结果。 12.496.500,00,对于DRP方法是Rp。 9.156.200,00,节省了26,71。计划和调度Sari Earth分配的结果如下:PKA产品:在297 m3、6月,9月和12月发现的运输量; PKM产品:3月份,6月,9月,11月和2月发现的运输量为256 m2。 Putra Makmur,PKA产品:在4月,7月,10月和1月发现的运输量为294平方米,PKM产品:在3月,6月,9月和12月发现的运输量为259平方米。 Sinar Jaya,PKA产品:296平方米的产品在4月,7月,10月和1月发现,PKM产品:262平方米的产品在3月,6月,9月和12月发现。 Nusa Indah,PKA产品:在4月,7月,10月和1月发现的运输量高达289平方米,PKM产品:在3月,6月,9月和12月发现的运输量为255平方米。

著录项

  • 作者

    Agus Putra;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"id","name":"Indonesian","id":20}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号