首页> 外文OA文献 >Transmission expansion planning considering energy storage
【2h】

Transmission expansion planning considering energy storage

机译:考虑储能的输电扩展规划

摘要

In electricity transmission networks, energy storage systems (ESS) provide a means of upgrade deferral by smoothing supply and matching demand. We develop a mixed integer programming (MIP) extension to the transmission network expansion planning (TEP) problem that considers the installation and operation of ESS as well as additional circuits. The model is demonstrated on the well known Garver's 6-bus and IEEE 25-bus test circuits for two 24 hour operating scenarios; a short peak, and a long peak. We show optimal location and capacity of storage is sensitive not only to cost, but also variability of demand in the network.
机译:在输电网络中,储能系统(ESS)通过平滑供应和满足需求提供了升级延期的方法。我们针对传输网络扩展规划(TEP)问题开发了混合整数编程(MIP)扩展,该扩展考虑了ESS以及其他电路的安装和操作。该模型在著名的Garver的6总线和IEEE 25总线测试电路上进行了演示,可用于两个24小时的操作场景;一个短峰,一个长峰。我们显示出最佳的存储位置和容量不仅对成本敏感,而且对网络需求的变化也很敏感。

著录项

  • 作者

    MacRae C; Ozlen M; Ernst A;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号