首页> 外文OA文献 >THE PRODUCTIVITY ANALYZES OF BORED PILE FONDATION IN THE MAIN BRIDGE AREA
【2h】

THE PRODUCTIVITY ANALYZES OF BORED PILE FONDATION IN THE MAIN BRIDGE AREA

机译:主桥区钻孔灌注桩的生产力分析

摘要

Productivity is an important thing that has to be known in implementing a project. The project is said successfull if the contractor manages to gain maximum profit and the owner obtains satisfactory output, also it on time to accomplish the project. One factor determining the success of a project is productivity. Specifically, the productivity in making foundation of bored pile can be increased by enhancing the resources for supporting it, including the project workers and the tools or equipment used in the project
机译:生产力是实施项目中必须知道的重要事情。如果承包商设法获得最大的利润并且业主获得满意的产出,那么该项目就说成功了,而且也按时完成了该项目。决定项目成功的一个因素是生产力。具体而言,可以通过增加支撑钻孔桩的资源(包括项目工人以及项目中使用的工具或设备)来提高钻孔桩基础的生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号