首页> 外文OA文献 >The optimization and mathematical models determination of copper recovery – the precondition for improvement of recovery in Bucim copper mine
【2h】

The optimization and mathematical models determination of copper recovery – the precondition for improvement of recovery in Bucim copper mine

机译:铜回收测定的优化和数学模型 - 提高Bucim铜矿回收率的前提条件

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The improvement in the chalcopyrite copper Bucim mine are gone forward to renewed reagent regime, including and involving new reagents for increase dudrecovery of copper and gold. The optimization and mathematical linear models using gradient method Box and Wilson are good example for improvement of industrialudrecoveries in flotation circuit. In this paper is shown optimization techniques, formatting the mathematical model and adequate model for carried out investigations. Tablesudand figures will show the optimal quantity in reagent regime (collectors), particle size, flotation time I rougher flotation, conditioning time etc.
机译:黄铜矿Bucim铜矿的改进将转向新的试剂体系,包括并涉及增加铜和金的回收率的新试剂。使用Box和Wilson梯度法的优化和数学线性模型是改进浮选回路工业回收率的很好的例子。本文展示了优化技术,格式化数学模型和进行研究的适当模型。表上的数字将显示最佳的试剂量(收集器),颗粒大小,浮选时间,粗浮选时间,调节时间等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号