首页> 外文OA文献 >Reasons for difference between real and projected operating supplies for supporting during construction of ramps
【2h】

Reasons for difference between real and projected operating supplies for supporting during construction of ramps

机译:在斜坡施工期间支撑的实际和预计运行供应之间存在差异的原因

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Exactly established longitudinal profile, as well as physical - mechanical properties of all lithological units along the route of a mining facility are very important for the design of an underground mining facilities. This paper presents the construction of ramp in an underground mine in Macedonia, where real and projected supporting operating supplies are compared.\ud\ud
机译:沿采矿设施路线准确建立的纵向剖面以及所有岩性单元的物理机械特性对于地下采矿设施的设计非常重要。本文介绍了马其顿地下矿山的坡道建设,比较了实际和预计的辅助运营物资。\ ud \ ud

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号