首页> 外文OA文献 >The Effect of Landing Size on Operational Delays for New Zealand Harvest Operations
【2h】

The Effect of Landing Size on Operational Delays for New Zealand Harvest Operations

机译:着陆面积对新西兰收割作业作业延误的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Landings are an integral part of New Zealand Harvest operations where extracted trees are processed into logs and loaded out onto trucks. Forest owners need to balance the cost and environmental considerations when designing and constructing landings, with the productivity and safety of the harvesting crew that will use the landing.The objective of this study is to gain a greater understanding of landing size and how they affect forest harvest operations. This study investigates the relationship between landing size and processing delays. A time study was carried out for ten harvest operations predominantly in the lower North Island. The time study recorded all delays on the processing task of measuring and cutting stems into logs. The delays were then categorised so that only processing delays that are influenced by the size of the landing remained. These processing delays were then expressed per m³ and used as the response variable in regression analysis to test their correlation against landing size and a range of other predictor variables.A very strong, linear relationship between processing delays per m3 and actual landing size was found. This indicates that harvest operations on smaller landings exhibited higher delays per m3 than those on larger landings. Loading of the deck was the most significant processing delay; this is a direct result of not having enough room for surge piles as delimbing was not able to be carried out during loader downtime. The significance of the relationships developed in this study can help forest owners realise the implications of building landings that are too small for the intended purpose. Not only will small landings affect productivity, but have the potential to financially affect the forest owner also.
机译:降落是新西兰收获行动不可或缺的一部分,在那里,提取的树木被加工成原木,然后装载到卡车上。森林所有者在设计和建造着陆区时需要平衡成本和环境因素,以及将要使用着陆区的采伐团队的生产力和安全性。本研究的目的是加深对着陆面积及其对森林的影响的了解。收割作业。这项研究调查着陆大小和处理延迟之间的关系。对主要在北岛下部的十个收获作业进行了时间研究。这项时间研究记录了所有将茎干切成原木的加工任务的延迟。然后对延迟进行分类,以便仅保留受平台尺寸影响的处理延迟。这些处理延迟然后以每立方米表示,并用作回归分析中的响应变量,以测试它们与着陆尺寸和一系列其他预测变量之间的相关性。发现每立方米的处理延迟与实际着陆尺寸之间存在非常强的线性关系。这表明在较小着陆点的采伐作业每立方米的延误要比在较大着陆点的采伐作业高。甲板的装货是最重要的处理延迟。这是直接的结果,因为没有足够的空间容纳调压桩,因为在装载机停机期间无法进行降落。在这项研究中建立的关系的重要性可以帮助森林所有者认识到对于预定目的而言过小的建筑着陆的含义。小规模的登陆不仅会影响生产力,而且还可能在经济上影响森林所有者。

著录项

  • 作者

    Jones Blake;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号