首页> 外文OA文献 >Issued as the Final Report on an Investigation of Field-Made Joints in Prestressed Reinforced Concrete Highway Bridge Girders; Project IHR-303, Illinois Cooperative Highway and Transportation Research Program
【2h】

Issued as the Final Report on an Investigation of Field-Made Joints in Prestressed Reinforced Concrete Highway Bridge Girders; Project IHR-303, Illinois Cooperative Highway and Transportation Research Program

机译:作为预应力钢筋混凝土公路桥梁现场接缝调查的最终报告发布;项目IHR-303,伊利诺伊州合作公路和交通研究计划

摘要

Tests of two prestressed concrete composite bridge girders which were continuousover two spans are reported. Both were I-section girders with cast-inplacedecks, and had spans of about 37 ft (11 m), and were approximately 1/3 scalemodels of structures spanning 125 ft (38 m). Each girder was constructed fromthree segments which were joined end-to-end by cast-in-place concrete splices.Modell was post-tensioned after erection of the girders and casting ofthe deck and splice concrete. The two end segments, each supported on the finalabutments and on temporary supports located about 1/3 of the span from the centralpier, were pretensioned for their dead loads plus the deck concrete. The centralsegment, which was supported on the central pier of the structure plus the twotemporary supports was precast reinforced concrete, plus a small amount of pretensioned reinforcement. Model 2 was externally similar, but was not post-tensioned.The segments were pretensioned for the final moments, and were joined by splicingreinforcing bars which extended into the splice region.Both structures were subjected to a series of loadings to the service load,design ultimate, and high over-load levels. Both had capacities which weresignificantly higher than the design ultimate values. The capacities weregenerally predictable on the basis of flexural strength calculations, and sheardid not cause major problems. Joint details in Model l lead to difficulties intwo tests, and this aspect of the design is discussed in detail.
机译:报道了两个跨过两个跨度的预应力混凝土组合桥的试验。两者均为带浇筑式甲板的I型截面梁,跨度约为37英尺(11 m),并且是跨度为125英尺(38 m)的结构的大约1/3比例模型。每个大梁由三个部分构成,三个部分通过现浇混凝土接头端对端连接在一起。模型1在大梁竖立并浇筑甲板和接头混凝土后进行预张紧。两个末端部分分别支撑在最后支座和临时支撑上,这些临时支撑位于距中心墩跨度约1/3的位置,并因其自重和桥面板混凝土而被预紧。支撑在结构中央墩上的中央分段加上两个临时支撑是预制钢筋混凝土,加上少量的预张钢筋。模型2在外观上相似,但不进行后张拉伸。各节段在最后时刻被预张紧,并通过延伸到拼接区域的拼接钢筋连接在一起。两个结构都承受了一系列的工作荷载,设计极限和高过载水平。两者的容量均显着高于设计最终值。根据抗弯强度的计算,这种能力通常是可预测的,而剪切力不会引起重大问题。模型1中的联合细节导致两次测试很困难,因此将详细讨论设计的这一方面。

著录项

  • 作者

    Gamble W.L.; Drew R.G.;

  • 作者单位
  • 年度 1979
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号