首页> 外文OA文献 >Joint Behavior of a Bolted Railway Bridge During Erection and Service
【2h】

Joint Behavior of a Bolted Railway Bridge During Erection and Service

机译:锚杆式铁路桥梁架设和使用过程中的联合行为

摘要

Measurements were made of the movements at connections of a 310 footrailway bridge over a period of three and a half years. The study was initiatedduring shop-assembly of a truss and was ended after three years of service loadings.As might be expected, substantial relative movements of the bridge joints occurredduring erection with the addition of dead load, bracing, and floor systems. Theeffects of the measured movements on changes in camber are discussed and comparedwith level readings taken during the three years of traffic. In essence, noservice movements were found; no evidence of a marked change in camber was found.These findings suggest that a properly designed structure with properly installedhigh-strength bolts will not slip under normal service loadings.
机译:在三年半的时间里对310步道桥连接处的运动进行了测量。该研究始于桁架的车间组装,并在三年的服役负荷后结束。可以预见,在安装过程中,桥架会发生相当大的相对运动,增加了静载,支撑和地板系统。讨论了测得的运动对弯度变化的影响,并将其与三年交通中的液位读数进行了比较。本质上,没有发现服务动向。没有发现弯曲度有明显变化的证据。这些发现表明,正确设计的结构和正确安装的高强度螺栓在正常使用载荷下不会打滑。

著录项

  • 作者

    Chesson Jr. E.;

  • 作者单位
  • 年度 1964
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号