首页> 外文OA文献 >Estimating Pollutant Removal Requirements for Landfills in the UK: III. PolicyAnalysis and Operational Implications.
【2h】

Estimating Pollutant Removal Requirements for Landfills in the UK: III. PolicyAnalysis and Operational Implications.

机译:估算英国垃圾填埋场的污染物去除要求:III.。政策分析和运营意义。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The policy analysis and management implications for achieving landfillequilibrium status within a sustainable timescale (decades rather thancenturies) are presented based on modelled results reported previously. Untilrelatively recently, timescale estimates suggested that equilibrium or landfillcompletion could be achieved within 40-60 years i.e. the same order of magnitudeas financial provision for aftercare. However results of modelling in this study(reported in previous paper) suggest that timescales may be considerably longer(many centuries in some instances) suggesting that financial provision may beinadequate. The role of the most promising and available waste treatmenttechnologies and strategic waste management options in contributing towardsachieving equilibrium status are discussed. Results suggest that a re-examination of techniques for accelerating landfill stabilisation, includingaerobic and bioreactor landfill, is warranted.
机译:基于先前报告的建模结果,介绍了在可持续的时间范围内(数十年而不是几个世纪)实现垃圾填埋平衡状态的政策分析和管理意义。直到最近,时间尺度的估算表明,平衡或填埋场的完工可以在40至60年内实现,即与后期护理的财政拨款数量级相同。但是,该研究的建模结果(在先前的论文中进行了报道)表明时间范围可能会更长(在某些情况下为多个世纪),这表明财务准备可能不足。讨论了最有前途和可用的废物处理技术和战略性废物管理选项在实现平衡状态中的作用。结果表明,有必要对包括有氧和生物反应器垃圾填埋场在内的加速垃圾填埋场稳定化的技术进行重新审查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号