首页> 外文OA文献 >En samfunnsøkonomisk og teknisk studie av et vanndistribusjonssystem i Kurunegala distriktet, Sri Lanka
【2h】

En samfunnsøkonomisk og teknisk studie av et vanndistribusjonssystem i Kurunegala distriktet, Sri Lanka

机译:斯里兰卡Kurunegala地区的供水系统的社会经济和技术研究

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This current study revolves around the Deduru Oya project in Sri Lanka and its interaction between old irrigation schemes and new-built ones. The right-bank canal or RB-canal, a 33 km long canal built in concrete is designed to distribute water from the new-built Deduru Oya reservoir to the older Inginimitiya reservoir, and to the smaller water tanks along the canal. The project is due operational in November 2013. The goal of the project is to meet the water requirements for the paddy fields in the Kurunegala district and to enable farmers to grow paddy (rice) two times a year instead of one, both in the wet Maha season, and in the dry Yala season. The Maha growing season is mostly dependent on precipitation, while the Yala season mostly is dependent on irrigation. Through a series of structured interviews and simulations through the water resources program WEAP, the study looks deeper into the effects of the RB-canal and to what extent the expectations would answer to the reality. Several scenarios such as different canal flow, climate changes and irrigation improvement were implanted in the simulation program.The results from the analysis show that the Deduru Oya project will have a positive effect on the paddy cultivation, increasing the yield. We see that the project will be able to supply enough water for the proposed paddy areas along the canal, as well as for the paddy areas downstream of the Inginimitiya reservoir. With scenarios regarding reduced precipitation, increased precipitation intensity and droughts expected to come with climate changes in this arid area, the reservoirs storage capacity will be crucial to store up and supply irrigation water throughout the year.The people in the affected areas are well aware of chronic water diseases, but have little faith in the government and how they will handle this problem. Pipe born water in these areas are unusual and according to the National Water Supply and Drainage Board there is no existing plan of this being developed in the nearest future. Since the canal is not yet operational and the information from the government very limited, the people today live in uncertainty regarding how their future will develop with this project.
机译:当前的研究围绕着斯里兰卡的Deduru Oya项目及其在旧灌溉方案和新建灌溉方案之间的相互作用。右岸运河或RB运河,一条33公里长的混凝土建成的运河,旨在将水从新建的Deduru Oya水库分配到较旧的Inginimitiya水库,以及沿运河的较小水箱。该项目计划于2013年11月投入运营。该项目的目标是满足Kurunegala地区稻田的水需求,并使农民每年在湿润的情况下每年两次而不是一次地种植水稻。玛哈季节,以及干旱的亚拉季节。玛哈生长季节主要取决于降水量,而亚拉生长季节主要取决于灌溉量。通过水资源计划WEAP的一系列结构化访谈和模拟,该研究更深入地研究了RB运河的影响以及人们期望对现实的回应程度。模拟程序中植入了不同的渠道流量,气候变化和灌溉改善等多种方案。分析结果表明,Deduru Oya项目将对稻田种植产生积极影响,从而提高产量。我们看到该项目将能够为沿运河的拟建稻田以及Inginimitiya水库下游的稻田提供足够的水。由于干旱地区预计会出现降水减少,降水强度增加和干旱的情景,因此水库的储水能力对于全年储存和供应灌溉水至关重要,受灾地区的人们都知道慢性水病,但对政府及其如何解决这个问题几乎没有信心。在这些地区,用管道输送的水是不寻常的,根据国家供水和排水委员会的说法,在不久的将来尚无现成的计划。由于运河尚未投入运营,而且政府提供的信息非常有限,因此,今天的人们仍不确定该项目的未来发展方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号