首页> 美国政府科技报告 >Greenbelt Service and Inspection Yard, Section E011a, Greenbelt Route,Supplementary Subsurface Investigation
【24h】

Greenbelt Service and Inspection Yard, Section E011a, Greenbelt Route,Supplementary Subsurface Investigation

机译:绿地服务和检查场,E011a部分,绿地路线,补充地下调查

获取原文

摘要

Results are summarized herein of six supplementary test borings made in theGreenbelt Service and Inspection Yard to investigate conditions along the 12-inch water main and emergency access road including retaining walls. The report contains geological sections which summarize information from the borings, logs of borings and text describing design and construction problems. Attached to the Appendix of the report are the results of three exploratory holes made to locate selected existing utilities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号