首页> 美国政府科技报告 >Delivering Better Value for Money: Determining Outsourcing Feasibility and Standard Pricing Methods.
【24h】

Delivering Better Value for Money: Determining Outsourcing Feasibility and Standard Pricing Methods.

机译:提供更好的物有所值:确定外包可行性和标准定价方法。

获取原文

摘要

Two databases of engineering hours were developed to aid contract administrators in negotiating consultant hours for contracts for preliminary engineering (PE) and/or construction engineering (CE) services. The local agency projects database includes 181 projects. The OTIA III bridge projects database includes 124 bridge repair and replacement projects. Databases include estimated consultant hours by task for the projects, and descriptive information for the projects. The databases were analyzed to identify relationships between project characteristics and consultant contract hours required. Results of these analyses are presented. A procedure for use of the databases in the negotiation process is presented. In addition, general information relating to procurement of personal services contracts is presented. This information was obtained from a literature review, the Oregon Department of Transportation, and other transportation agency personnel.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号