首页> 美国政府科技报告 >New Water Level Prediction Method Applied to the Zeepipe Dredging Project
【24h】

New Water Level Prediction Method Applied to the Zeepipe Dredging Project

机译:Zeepipe疏浚工程新水位预测方法

获取原文

摘要

A new system for onboard water level prediction is developed and applied to theZeepipe project. Survey vessels and hoppers are equipped with this new software system that proves to be very accurate in the field. The paper gives a short description of the Zeepie Project, the method used in the water level prediction system and the operational system onboard of the vessels. Furthermore, the performance in the field after half a year of operation is discussed. Some theoretical background on the astronomical tide is included in the appendix.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号