首页> 美国政府科技报告 >ATMS Concept of Operations and Generic System Requirements: Task B Final InterimReport for Design of Support Systems for Advanced Traffic Management Systems
【24h】

ATMS Concept of Operations and Generic System Requirements: Task B Final InterimReport for Design of Support Systems for Advanced Traffic Management Systems

机译:aTms运营概念和通用系统要求:任务B最终临时报告,用于设计先进交通管理系统的支持系统

获取原文

摘要

This document is the second in a series describing the results of a five-yearresearch program entitled the Design of Support Systems for Advanced Traffic Management Systems. The purpose of this work is to define, design, prototype, and evaluate the baseline support systems for the implementation of Advanced Traffic Management Systems (ATMS).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号