首页> 美国政府科技报告 >Electrochemical Chloride Removal and Protection of Concrete Bridge Components:Laboratory Studies
【24h】

Electrochemical Chloride Removal and Protection of Concrete Bridge Components:Laboratory Studies

机译:电化学氯化物去除和混凝土桥梁组件的保护:实验室研究

获取原文

摘要

The feasibility of electrochemical chloride removal and concurrent protection asa rehabilitation option for concrete bridge structures was investigated. Chloride removal process procedures were developed, and the effects of the process on structure concrete integrity and reinforcing steel were studied. The report discusses the laboratory evaluations of this process. (Copyright (c) 1993 National Academy of Sciences.)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号