首页> 美国政府科技报告 >Crack-Reduction, Pavement-Reinforcement, Glasgrid
【24h】

Crack-Reduction, Pavement-Reinforcement, Glasgrid

机译:减少裂缝,路面加固,Glasgrid

获取原文

摘要

The main objective of the study was to evaluate the effectiveness of a reflective crack reducing method. To do this, two locations were selected for evaluation. The first location was located on I-70, west of the Eisenhower Memorial Tunnel. On the project, the section containing Glasgrid, a type of reflective cracking treatment, was evaluated and compared to an equivalent section containing the material (Trevira Spunbond) that was initially selected by the contractor. Both the Glasgrid and Trevira Spunbond test sections were compared to an untreated section. The second location was on U.S. 40, east of Hayden.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号