首页> 美国政府科技报告 >Implementation Plan for Use of Dynamic Pile Monitoring by PENNDOT
【24h】

Implementation Plan for Use of Dynamic Pile Monitoring by PENNDOT

机译:pENNDOT使用动态桩监测的实施方案

获取原文

摘要

The report presents the implementation plan for the use of dynamic pilemonitoring on PennDOT projects. It is based on research into the available equipment and three field demonstrations. Two reports documenting the research are referenced. It was concluded that the Pile Driving Analyzer is the equipment that should be used on PennDOT projects by a qualified testing agency. Specifications for its use are presented. The plan addresses methods of retaining the services, training, incentives for use, a piling database, and future evaluations.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号