首页> 美国政府科技报告 >Supplementary Subsurface Investigation Glenmont Storage Yard, Section B012, Glenmont Route, August 5, 1993
【24h】

Supplementary Subsurface Investigation Glenmont Storage Yard, Section B012, Glenmont Route, August 5, 1993

机译:1993年8月5日,Glenmont Route B012号格伦蒙特仓库补充地下调查

获取原文

摘要

Results are summarized herein of two test borings made to investigate subsurface conditions at the location of the planned relocation of the 30-inch water main in the Glenmont Storage Yard in Section B012 of Glenmont Route. The report contains a geological section which summarizes information from the borings, log of borings and a text describing design and construction problems.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号