Modelling Activity Dependencies for Building Construction Project Scheduling

机译:建筑施工项目调度的活动依赖性建模

获取原文

摘要

Activity dependencies are used to represent an important part of the logic of aconstruction project schedule, for example, general construction strategy, the sequence of activities and their overlap. The research investigates the existence of these different dependencies within building construction project schedules. The findings form the basis for the development of a schedule preparation model with which a planner: prepares schedules using a domain specific approach; uses specific procedures to identify and create different activity dependencies; and applies tailored data structures to store characteristics of individual activity dependencies. (Copyright (c) 1993 Technical Research Center of Finland.)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号