首页> 美国政府科技报告 >Environmental Monitoring Plan Annual Report, 1993. Volume 1. Executive Summary.Volume 2. Non-Proprietary Data. Volume 3. Proprietary Data
【24h】

Environmental Monitoring Plan Annual Report, 1993. Volume 1. Executive Summary.Volume 2. Non-Proprietary Data. Volume 3. Proprietary Data

机译:环境监测计划年度报告,1993年。第1卷。执行摘要。体积2.非专有数据。第3卷。专有数据

获取原文

摘要

The Energy Security Act of 1980 established a program to provide financialassistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Dow Syngas Project design has a high-temperature entrained-flow slagging type gasifier, which began operating in 1987. Dow agreed to comply with existing environmental regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in areas of potential environmental and health concern,relative to synthetic fuels facilities. The phases of monitoring in the EMP tests parameters of interest in air, water and solid waste to establish a data base of information that can be applied to resolving environmental uncertainties relative to replication of synthetic fuels plants. This report contains results of monitoring in the areas of: Coal Slurry Preparation; gasification; Heat Recovery/Boiler; Selectamine/Selectox; Tank Vent Collection/Thermal Incineration; Power I/Power II; and Auxilliary Waste Streams.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号