首页> 美国政府科技报告 >Construction of Periodic Timetables. Part 2. An Application
【24h】

Construction of Periodic Timetables. Part 2. An Application

机译:定期时间表的构建。第2部分。申请

获取原文

摘要

This report is a follow up of 'Construction of Periodic Timetables - Part I: ACutting Plane Algorithm' (PB95-215141) and addresses the problem of quickly generating many periodic timetables for train arrivals and departures at railway stations. With these timetables, then, the performance of a railway station track layout design can be evaluated by means of simulation. We describe a mathematical model for a timetable structure from which a number of timetables should be generated. It can be shown that this is far from trivial, i.e. the generation problem is NP-complete. Still, a cutting plane algorithm can be formulated that is efficient from computational point of view. A large part of this report is devoted to the description of a case study that shows that despite the complexity of the problem the algorithm can sample many timetables from a timetable structure very efficiently, thus allowing for effective analysis of a track layout design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号