首页> 美国政府科技报告 >Final Environmental Impact Statement/Report and 4(f) Statement. Volume 1.Northeast Corridor Improvement Project Electrification: New Haven, CT to Boston, MA
【24h】

Final Environmental Impact Statement/Report and 4(f) Statement. Volume 1.Northeast Corridor Improvement Project Electrification: New Haven, CT to Boston, MA

机译:最终环境影响声明/报告和4(f)声明。第1卷。东北走廊改善工程电气化:康涅狄格州纽黑文市,马萨诸塞州波士顿市

获取原文

摘要

This document is the final environmental impact statement and final environmentalimpact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume I) is the main body of the FEIS/R and includes a 4(f) Statement on the proposed location of an electrification facility in the Great Swamp Wildlife Management Area.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号