首页> 美国政府科技报告 >Superfund Explanation of Significant Difference for the Record of Decision (EPARegion 8): Silver Bow Creek/Butte Area, Warm Springs Pond Operable Unit, Silver Bow/Deer Lodge, Upper Clark Fork River Basin, MT., June 24, 1991
【24h】

Superfund Explanation of Significant Difference for the Record of Decision (EPARegion 8): Silver Bow Creek/Butte Area, Warm Springs Pond Operable Unit, Silver Bow/Deer Lodge, Upper Clark Fork River Basin, MT., June 24, 1991

机译:超级基金解释决定记录的显着差异(EpaRegion 8):silver Bow Creek / Butte area,Warm springs pond Operable Unit,silver Bow / Deer Lodge,Upper Clark Fork River Basin,mT。,1991年6月24日

获取原文

摘要

The Explanation of Significant Differences modifies certain elements of the WarmSprings Ponds remedy, as described in the Warm Springs Ponds Record of Decision (September 1990) (PB91-921528). The most significant aspect of the decision involves Pond 1 and the area below Pond 1. The Record of Decision specified that Pond 1 would be dry-closed, but a decision regarding the area below Pond 1 was deferred for one year. Because these areas have no role in the treatment of water entering the pond system from Silver Bow Creek, the decision has been made to separate them from the active portions (Ponds 2 and 3). Pond 1 and the area below will be the subject of a second and separate proposed plan, public review, and Record of Decision. This change, together with other minor and ancillary changes to the Warm Springs Ponds remedy, are described in detail.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号