首页> 美国政府科技报告 >Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead,SD (In Three Parts): 3. Geomechanical Monitoring and Modeling Using UTAH3
【24h】

Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead,SD (In Three Parts): 3. Geomechanical Monitoring and Modeling Using UTAH3

机译:轴稳定性和支柱采矿的岩石力学研究,Homestake矿山,铅,sD(三部分):3。使用UTaH3进行地质力学监测和建模

获取原文

摘要

A U.S. Bureau of Mines case study of pillar recovery in high-grade ore near theRoss shaft at the Homestake Mine, Lead, SD, has demonstrated the usefulness of the finite-element method for evaluating shaft pillar mining plans and shaft stability. However, after mining began, concern developed because of cracks and other signs of ground motion that appeared at considerable distances from the area of active pillar mining. An intense three-dimensional modeling effort using the computer modeling program UTAH3 was initiated. The results again showed the observed effects were within expectations and that the shaft would remain safe. Three-dimensional analyses of alternate pillar mining scenarios indicated that more of the shaft pillar ore reserve could be recovered than previously thought on the basis of two-dimensional analyses. This report focuses on startup and implementation of the three-dimensional model, calibration of the three-dimensional model, and application of the model to shaft pillar mining.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号