首页> 美国政府科技报告 >Summary of the Evergreen Operating Corporation Rosa No. 283 Well CooperativeResearch Project San Juan Basin. Topical Report, May 1, 1993-January 15, 1994
【24h】

Summary of the Evergreen Operating Corporation Rosa No. 283 Well CooperativeResearch Project San Juan Basin. Topical Report, May 1, 1993-January 15, 1994

机译:常青经营公司罗莎283井合作研究项目摘要圣胡安盆地。专题报告,1993年5月1日至1994年1月15日

获取原文

摘要

The major objectives of the cooperative effort were to: recommend a remedialstimulation treatment to enhance gas production from a previously hydraulically fracture stimulated well; and Evaluate the effect of the remedial stimulation treatment using well testing techniques. The recommended remedial stimulation program consisted of a large volume nitrogen injection treatment followed by a controlled blow-down period, maintaining a high bottomhole flowing pressure. There were indications early in the producing life of the well that the near-wellbore permeability may be stress sensitive. Therefore, high producing back-pressures were maintained during the blow-down period in an attempt to limit cleat closure. However, analysis of post-remedial treatment production data indicates that higher gas rates are achieved at lower wellhead pressure rather than at higher wellhead back-pressure.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号