Bridge Management System Phase 2. Final Report, Volume 2. A Standardized CostDatabase for the PONTIS BMS

机译:桥梁管理系统阶段2.最终报告,第2卷.pONTIs Bms的标准化CostDatabase

获取原文

摘要

At present, more than forty state departments of transportation are planning toimplement Pontis, a comprehensive and powerful bridge management system developed by Cambridge Systematics. Research was conducted to solicit, compile, and analyze cost data that could be shared by the Pontis user states. A questionnaire survey was executed and a number of regional workshops were conducted to obtain element and action cost data in three categories: expert opinion, element and action cost data in three categories: expert opinion, historical costs, and ongoing project costs. Seventeen states contributed 2283 data points that correspond to 447 of 468 Pontis actions. The data were analyzed by data type and geographical region. In addition, the relationship between total project costs and selected categories of indirect cost (mobilization, traffic control and structure disposal) were determined through regression analysis.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号