首页> 美国政府科技报告 >Bridge Management System Phase 2. Final Report, Volume 1. Document ImagingTechnology for Bridge Maintenance
【24h】

Bridge Management System Phase 2. Final Report, Volume 1. Document ImagingTechnology for Bridge Maintenance

机译:桥梁管理系统阶段2.最终报告,第1卷。用于桥梁维护的文件成像技术

获取原文

摘要

A research project was conducted to determine the feasibility of implementing acomputer-based document imaging system within the Bridge Maintenance Department of the South Carolina Department of Transportation (SCDOT). The Department currently maintains a large number of paper documents that include bridge inspection reports, pile logs, load rating calculations, sign inspection reports, and bridge repair plans.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号