首页> 美国政府科技报告 >Field Testing of Bridge Design and Retrofit Concepts. Part 2 of 2. Experimentaland Analytical Studies of the Mt. Diablo Blvd. Bridge
【24h】

Field Testing of Bridge Design and Retrofit Concepts. Part 2 of 2. Experimentaland Analytical Studies of the Mt. Diablo Blvd. Bridge

机译:桥梁设计和改造概念的现场测试。 2的第2部分。山的实验和分析研究。暗黑破坏神大道桥

获取原文

摘要

Field testing and dynamic analysis of an elevated curved bridge arose out of thereconstruction and demolition activities at the Interstate 680/Route 24 interchange in Walnut Creek, California. Prior to its demolition, the bridge was subjected to forced vibration tests and ambient measurements. During the forced vibration tests, vibration generators placed on the deck of the bridge were used to excite the bridge in its principal directions. The resulting steady state response was recored and used to evaluated the dynamic properties of the entire bridge. For the ambient measurements, response to factors such as wind and local traffic were determined. After the beginning of the demolition sequence, ambient response of partial frames of the bridge were measured.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号